top of page
All Posts
Easements, covenants and consent notices on a commercial title: reading the record of title for how you will use the site
The title lists every registered interest by instrument number. The operational question is whether trucks can use the right of way, where the services run, and whether the car parks are in the sale.
Steve Parker
Sep 196 min read
Buying a tenanted commercial building: the building-side lease checks before you go unconditional
You take over the landlord's side of every lease and every owner's duty on the building. The number that matters is the rent less what the leases leave with you.
Steve Parker
Sep 196 min read
Unconsented work and certificates of acceptance in a commercial building: what the records show, and what it costs you
The council file only holds the work the council knows about. Unconsented mezzanines, fit-outs and changes of use are found by comparing the building to the consented drawings, and their cost belongs in the price.
Steve Parker
Sep 196 min read
HAIL sites and contaminated land: what a commercial or industrial buyer needs to check
A HAIL listing does not prove the land is contaminated, but it brings the soil rules into play for earthworks, subdivision and a change of use. Check the record before you go unconditional.
Steve Parker
Sep 196 min read
Zoning, overlays and designations: can you actually use, or expand, the commercial building you are buying?
The zone on the planning map is the starting point, not the rule. Overlays, designations, precincts and consent conditions can limit what you can do even where the base zone allows your use.
Steve Parker
Sep 196 min read
BWOF and the compliance schedule when you buy a commercial building: what transfers, and what to ask for
The BWOF obligation sits with the owner, so it is yours from settlement. Ask for the compliance schedule, the current BWOF and the last year of IQP reports before you go unconditional.
Steve Parker
Sep 196 min read
LIM vs council property file for a commercial building: what each shows and what neither tells you
The LIM tells you what the council has noted. The property file tells you whether the building matches what was consented. Neither shows unconsented work.
Steve Parker
Sep 196 min read
Buying an earthquake-prone building: %NBS, the EPB register, and what the September 2026 reform would change
Not on the register means no notice has been issued. It does not mean the building was assessed. And the rules are changing, conditionally, as of September 2026.
Steve Parker
Sep 196 min read
Buying a warehouse or industrial unit for your own business: the owner-occupier checklist
An owner-occupier reads the records for whether the business can lawfully and physically move in, not for yield. Here is what to check before going unconditional.
Steve Parker
Sep 196 min read
The due diligence period on a commercial purchase, and what fits inside it
There is no fixed length in law. 10 to 15 working days is common, and the lead time on a LIM or a seismic report decides whether that is enough.
Steve Parker
Sep 194 min read
Commercial building inspection cost in NZ, and which expert you actually need
A building inspection is one of at least five reports a commercial buyer might need. Here is roughly what each costs and who actually does it.
Steve Parker
Sep 194 min read
The information memorandum and the listing, checked against the record
An IM is marketing, not disclosure. Floor area, car parks, titles and permitted use are the figures most likely to disagree with the record.
Steve Parker
Sep 194 min read
Commercial property due diligence in NZ: the buyer's checklist, timeline and cost of each check
The conditional period is usually 10 to 15 working days. Here is what to check in that time, what it costs, and who does each check.
Steve Parker
Sep 197 min read


How to calculate floor area for a flooring quote in NZ
Measure each room from its clear size, split by timber, tile and carpet, and state waste separately. A sample plan shows a 2.10 m² over-measure.
Steve Parker
Sep 195 min read


Electrical takeoff: counting points off a plan, a worked NZ example
A sample plan counted one symbol at a time: 28 downlights, 18 double GPOs, 12 switches, 71 points plus the DB, and 4 downlights a quote missed.
Steve Parker
Sep 195 min read


Quote vs drawings: check the quantities before you sign
A quote is only as good as its quantities. In a sample drainage check, 9 of 12 lines didn't match the drawings and one wasn't priced at all.
Steve Parker
Sep 195 min read


How to compare building quotes like-for-like (worked example)
Supplier A looked $13,860 cheaper. Once its 6 unpriced items got an allowance, it was $1,785 dearer. The like-for-like method, step by step.
Steve Parker
Sep 195 min read


How to calculate roof area from a plan, and why quotes come up short
A roof plan shows the roof flat. The sheets cover the slope. A worked 25° sample shows the pitch factor and what pricing on plan area costs.
Steve Parker
Sep 195 min read


How to check a drainage plan before you price it
A sample drainage plan, measured: 109.5 m of stormwater pipe, 3 manholes, 4 sumps, 6 downpipes, and 1 pipe drawn to run uphill.
Steve Parker
Sep 195 min read
Quantity Surveyor Auckland: Fixed-Price QS Services in 48 Hours
QS services in Auckland at a published price: takeoffs checked from $490+GST per trade, tender packs from $1,250+GST, back in 48 hours. Builders and subcontractors.
Steve Parker
Sep 123 min read
Chat with us
bottom of page